WE HAVE A CLIENT IN GULF COUNTRIES WHO IS INTERESTED IN PUTTING UP PHENOL PLANT (CAPACITY 20000 MT/YEAR). OTHER DETAILS ARE AS FOLLOWS:
I) ELECTRICITY COST = 0.07$/KW
II) COST OF WATER = RO BY OURSELVES
III) COST OF THE LAND = RENT 0.30$/M2 HEAVY.
IV) OTHER RELEVANT INFORMATION = GAS, GRUD FUEL = 100$/MT.
V) PLEASE NOTE THAT THE FACTORY LOCATION WILL BE SEA BANK.
THE SUPPLIER HAS TO GIVE:
A) ECONOMICS & COSTING OF THE PROJECT
B) IF ACCEPTED, HE HAS TO GIVE TOTAL DESIGN, TECHNICAL KNOW-HOW,
ERECTION, COMMISSIONING & PROVE PERFORMANCE.
C) HE WILL ALSO ADVISE FOR OPTIMUM PLANT CAPACITY
THOSE COMPANIES WHO ARE RUNNING A PLANT WILL BE PREFERERED, BUT
CONSULTANT ALSO CAN OFFER SERVICES WITH DETAIL AT THE FOLLOWING ADDRESS:
UNIPHOS AGRO INDUSTRIES LTD.,
READYMONEY TERRACE
167, DR. A B ROAD
WORLI , MUMBAI - 400 018
PHONE NO. : 0091-22-24930681
FAX NO. : 0091-22-24938826
WEBSITE : http://www.uniphosagroindustries.com